Bathroom Remodel Cost Calculator
Enter your bathroom size, how far you are taking the work, and the fixture level you have in mind to get a realistic low-to-high cost range. The breakdown below the total shows where the money actually goes, line by line.
A powder room is 18–30 sq ft; a full hall bath is 40–60 sq ft.
Relocating a drain adds roughly 15% to the job.
Local labour rates move the whole job up or down.
- Most likely cost
- $12,500
- Labor40% of the job
- $3,600 – $6,400
- Fixtures & vanity18% of the job
- $1,620 – $2,880
- Tile & surfaces16% of the job
- $1,440 – $2,560
- Plumbing & electrical12% of the job
- $1,080 – $1,920
- Permits & disposal4% of the job
- $360 – $640
- Contingency10% of the job
- $900 – $1,600
What this figure includes
This is a planning range for a licensed contractor doing the work, priced in current US dollars. It includes labor, materials, standard permits and a 10% contingency. It does not include structural work, moving walls, window replacement, asbestos or lead abatement, mold remediation, upgrading an undersized electrical panel, or design fees. Fixed-cost items mean small bathrooms always price high per square foot.
How this is calculated
How the estimate is built
Remodel pricing is done per square foot of floor area, then adjusted by four multipliers. The full expression is:
Cost = floor area × scope rate × fixture factor × plumbing factor × regional factor
The scope rate is the base cost per square foot and it carries most of the weight. A cosmetic refresh — paint, a new vanity top, a new toilet, re-grouting, swapping light fixtures — runs about $90 to $160 per square foot. A mid-range remodel that replaces the tile, tub or shower pan, vanity and flooring runs $180 to $320. A full gut back to the studs, with new substrate, waterproofing, wiring and often new plumbing rough-in, runs $320 to $550.
The three remaining factors are simple multipliers. Builder-grade fixtures come in around 0.85 of the mid-grade baseline; high-end fixtures around 1.45. Relocating a toilet, tub or vanity adds about 15%, because it means opening the floor, cutting and re-routing drain lines at the correct fall, and often bringing that section up to current code. The regional multiplier reflects local labor rates: expect 1.2 to 1.5 in San Francisco, Boston, Seattle or New York, near 1.0 across the Midwest and the Sun Belt, and 0.8 to 0.9 in rural markets.
A worked example
A 50 sq ft hall bathroom, mid-range scope, mid-grade fixtures, no plumbing moved, US-average pricing:
- Low end: 50 × $180 × 1.0 × 1.0 × 1.0 = $9,000
- High end: 50 × $320 × 1.0 × 1.0 × 1.0 = $16,000
- Midpoint: about $12,500, or roughly $250 per square foot
Now upgrade the fixtures and move the tub to the opposite wall, in a metro at 1.25:
- Low: 50 × $180 × 1.45 × 1.15 × 1.25 = $18,759
- High: 50 × $320 × 1.45 × 1.15 × 1.25 = $33,350
The room did not change size. Three decisions nearly doubled the job.
Where the money goes
Labor is about 40% of a bathroom remodel and is the line item people consistently underestimate. A bathroom is the most trade-dense room in a house: demolition, plumbing, electrical, framing repair, drywall, waterproofing, tile setting, painting and finish carpentry, all inside about fifty square feet where only one trade can work at a time. That sequencing, not the hourly rate, is what makes bathrooms expensive per square foot.
Fixtures and the vanity run about 18%, tile and surfaces about 16%. These are the two categories you genuinely control after the contract is signed — the same tile setter's labor covers a $3/sq ft ceramic and a $30/sq ft marble. Plumbing and electrical are about 12% when nothing moves, and rather more when it does. Permits and disposal are about 4%, and every bathroom job should carry a 10% contingency because behind the tile there is frequently rotten subfloor, a leaking closet flange or wiring that will not pass inspection.
Reading the range honestly
Treat the low number as what the job costs if nothing unexpected appears and you make restrained selections, and the high number as what it costs with a few upgrades and one real surprise. Bids that come in well under the low end usually exclude something — check whether the price includes demolition, disposal, permits and the fixtures themselves, or whether fixtures are an owner-supplied allowance.
Small bathrooms price badly per square foot. A powder room still needs a plumber, an electrician, a tile setter and a painter, so the fixed costs are spread over 20 square feet rather than 60. Do not compare a powder room's per-square-foot figure with a primary suite's and conclude you are being overcharged.
Cutting cost without cutting quality
Keeping every fixture in its existing location is the single largest saving available, worth roughly 15% on its own. After that: keep the tub if it is sound and have it reglazed, tile the wet walls fully and paint the rest, choose a stock vanity in a standard width, and spend the saved money on the waterproofing membrane and the fan, which are the two items you can never economically revisit once the tile is set.
Cost figures last reviewed 9 Sept 2026 · General US contractor pricing ranges per square foot of bathroom floor area.
Frequently asked questions
- How much does a bathroom remodel cost in 2026?
- A typical mid-range remodel of a 40–60 sq ft bathroom runs about $10,000 to $20,000 in an average US market. Cosmetic refreshes start near $5,000, and a full gut of a large primary bathroom with high-end fixtures can exceed $50,000.
- Why is moving the toilet or tub so expensive?
- Drain lines need a consistent fall of about a quarter inch per foot, so relocating a fixture means opening the floor, sometimes notching or sistering joists, and re-plumbing to code. It typically adds 15% or more to the total and can trigger a broader inspection.
- How long does a bathroom remodel take?
- Two to three weeks for a cosmetic refresh, three to five weeks for a mid-range remodel, and six to ten weeks for a full gut. Most of the calendar time is sequencing and inspection waits rather than active work.
- Do I need a permit to remodel a bathroom?
- Replacing finishes like paint, a vanity or a toilet in the same location usually does not require one. Moving plumbing or electrical, altering framing, or adding circuits almost always does. Unpermitted bathroom work is a common problem at resale.
- How much contingency should I budget?
- Ten percent on a newer home and fifteen to twenty percent on anything built before 1980. Bathrooms hide water damage, and the cost of a rotten subfloor or a failed closet flange is only discovered after demolition.
- Does a bathroom remodel add value to a house?
- A mid-range bathroom remodel typically returns somewhere around 60–70% of its cost at resale, and an over-improved bathroom returns less. Adding a second full bathroom to a one-bathroom house generally returns considerably more than upgrading an existing one.
Related calculators
- Kitchen Remodel Cost CalculatorEstimate kitchen remodel cost by size, scope, cabinet tier, countertop material and applia…
- Window Replacement Cost CalculatorEstimate window replacement cost by window type, frame material, glazing and install metho…
- Foundation Repair Cost CalculatorEstimate foundation repair cost by foundation type, problem, affected linear feet and pier…